Days Century

Growers

Project Description

  • Supply and Install One 60’x30’x24’ cooler box with One 20hp Condensing unit and Evaporator

  • Supply and Install Two 30’x30’x24’ cooler box’s with Two 7 ½ hp Condensing units and Evaporators. Both are controlled atmosphere (CA) rooms which are filled with nitrogen to put the fruit to sleep.

  • Supply and Install One 30hp blast cooler condensing unit with Three Evaporators designed to pull down 80,000 pounds of pears from 80f to 31f in 24 hours.

  • Supply and Install Three 8’wx10’h (CA) sliding doors

Related Projects

Back to Top
Descargar musica